Final Writing Assignment Choice

Final Assignment

Final Assignment

de Jhansyrani Parivel -
Número de respuestas: 1

State Project Management Unit

          In order to ensure the strength, safety and to improve the operational performance of the existing Dams in a sustainable manner, Dam Rehabilitation and Improvement Project is taken up for implementation by Government of India with World Bank Assistance, and is being supervised and coordinated by Central Water Commission (CWC) at the national level and the State Project Management Unit (SPMU) at the State level.

The Project with an implementation period of six years, has become effective on 18th April 2012, and is under implementation.

In Tamil Nadu, Water Resources Department (WRD) is one of the participating Department. The total number of dams taken under DRIP in Tamil Nadu is 105 dams of which 69 dams (i.e 64 dams + 4 drinking water reservoirs+ 1  Anicut) are WRD dams and 36 dams are TANGEDCO dams.

 In addition, Catchment Area Treatment works are taken up by the AED (Agricultural Engineering Department) in two reservoirs, namely Krishnagiri and Kundah reservoirs.

Mile Stones in DRIP:

Ø  The Project agreement has been signed with the World Bank on 21.12.2011.

Ø  The Project is effective from 18.4.2012.

Ø  State Project Management Unit has been formed with 50 nos. of staff strength.

Ø  Formation of Empowered Committee for DRIP

Ø Two Dam Safety Review Panels have been formed for inspecting the ongoing projects then and there.

Ø The Rehabilitation works  are taken up for the implementation, after getting the clearance of revised hydrological review study report, Dam Safety Review Panel inspection, approval of Project Screening Template and Bid document by the competent authorities.

Department service to the Public:

·         To provide a supply of water for towns, cities and mining sites.

·         To provide a supply of water for the irrigation of crop.

·         To generate electricity in hydro-electric power stations.

·         To help control or mitigate floods.


En respuesta a Jhansyrani Parivel

Re: Final Assignment

de Jhansyrani Parivel -

1.Name : Jhansy Rani Parivel

2. Report Title: Discuss the work responsibilities of your office.

3. Option A

4. The Project agreement has been signed with the World Bank on 21.12.2011.

Ø  The Project is effective from 18.4.2012.

Ø  State Project Management Unit has been formed with 50 nos. of staff strength.

Ø  Formation of Empowered Committee for DRIP

Ø Two Dam Safety Review Panels have been formed for inspecting the ongoing projects then and there.

Ø The Rehabilitation works  are taken up for the implementation, after getting the clearance of revised hydrological review study report, Dam Safety Review Panel inspection, approval of Project Screening Template and Bid document by the competent authorities.